Home Our Company Company Projects Langara College A Building DDC Upgrade
Langara College A Building DDC Upgrade PDF Print E-mail

Langara College has two buildings one constructed in 1969 and the other in 1994. Labeled the "A" and "B" buildings respectively, the pneumatic and other DDC control systems are being replaced with an open operable host. The host chosen is Richards-Zeta and is now comprised of 40 Richards-Zeta controllers, Trane heat pumps (LonWorks), Schneider power meters (ModBus) and Douglas Lighting (LonWorks) interfaced to the RZ Host.